CreaTech


Course Introduction

Class Expectations

Class Procedures/Policy

Theft/Vandalism Policy

Sign Sheet

Parent/Student Signature Sheet


1-21-19

Finish:

Class Expectations


-Skills Inventory

-Assign Lockers

1-22-19

Tour of Technology


-Epilog Laser Demo

-CNC Router Demo

-CNC Plasma Demo


1-23-19

Introduce 1st project (Engrave existing piece, requirements, generate ideas)

G.C Assign, Drawing & Paragraph due Tuesday.


Content

-Sketching, Drawing, value, orthographic projection, pictoral, dimensioning.

Alphabet of lines handout



1-24-19

Log into computers 1st time

-Clear expectations

-Assign computers to students

-Google classroom login

-Pinterest account setup

1-25-19




Demo: Intro to Epilog laser, Using Word & Powerpoint

-Key features

-Hidden Concepts

Lab: Project 1 (sketch work w/ written description)

-Bring in objectr

1-28-19

Demo: Intro to Epilog Laser, features at the laser

-Control panel

-Setting up a workpiece

Lab: Project 1 (Sketch work

1-29-19

Lab: Project 1 (powerpoint & at the laser)

- Be sure all drawings and written descriptions have been approved

1-30-19

Lab: Project 1 (powerpoint & at the laser)

1-31-19

Intro to project 2 (cutting & engraving task)

-Req. generate ideas not an elaborate task, a task purpose for project combined cutting & engraving.

Lab 1 & 2. projects 1 students take precedence. Project 1 due @ end of day.

2-1-19









G.C Drawing & write up due @ the end of the hour.


LabL 1b (Cutting)

2-4-19

Intro to first Woodworking project (intarsia)


Lab 1b (Laser cutting)

2-5-19

Lab 1b (Laser cutting)


2-6-19

Content: Woodworking competencies

Miter saw demo

Over of processes, jointer, planer, tablesaw.


2-7-19

Miter Saw safety test

Content: Woodworking competencies

Band Saw/scroll saw

Overview of processes: sanding materials & processes

2-8-19











Band saw / Scroll saw safety test

Sanding safety test


Lab 1b (cutting)

2-11-19

Project 2. Intarsia

Requirements (Examples)

Process video


2-12-19

Project 1b due

If done work on plan 2. Have sketch size for project.

RIm document showed to class

2-13-19

Intro the RIM doc (planning)

Resources / Info / Materials


G.C RIM Document for project 2

2-14-19

Lab: Project 2 (RIM & AutoCAD work)

2-15-19











Tech Competency Test

(Design, epilog laser)

Lab: project 2 (RIM & AutoCAD work)


2-18-19

Project 2 RIM Document on G.C due Today @ end of class.

Lab: Project 2 (RIM & AutoCAD)

-Work on plywood.

Time to carve outside of class.

2-19-19

Lab: Intarsia

2-20-19

Lab: Intarsia

2-21-19

Distract Inservice: No School

2-22-19





















Lab: Intarsia

2-25-19

Lab: Intarsia

Project Due @2:46

2-26-19

Intro concepts of CNC (brief)

-What is CNC

Demo in front of router

Machine running/examples

Start Aspire tutorial with handout

2-27-19

Finish Aspire Tutorial

Introduce graphics we have available

Introduce aspire task 3a

-Not to be cut, only previewed

-A sign with specific specs

-see project handout 4 details

2-28-19

Parent Teacher conferences: No school

3-1-19












CNC Router formative assessment

-Project 3b work time

3-4-19

CNC router bits presentation


lab: Last day for project 3a.

Due @ the end of class.

3-5-19

CNC Router test.


Lab: 3b RIM document. Due @ 2:46 on friday

3-6-19

Lab: 3b RIM document. Due @ 2:46 on friday

3-7-19

Lab: 3b RIM document. Due @ 2:46

3-8-19














Lab: 3b CNC Router

3-11-19

Lab: 3b CNC Router

3-12-19

Lab: 3b CNC Router

3-13-19

Lab: 3b CNC Router

3-14-19

Lab: 3b CNC Router

3-15-19























Lab: 3b CNC Router

3-18-19

Lab: 3b CNC Router

3-19-19

Lab: 3b CNC Router

3-20-19

Lab: 3b CNC Router

3-21-19

Lab: 3b CNC Router

Due @ 12:00

3-22-19

















Content: Intro to metals


4-1-19

CNC Plasma / Handheld plasma demo

-Intro to project 4a CNC Plasma


4-2-19

Lab: Project 4a planning day

4-3-19

Lab: Project 4a planning day

4-4-19

Lab: Project 4a planning day

RIM document due @ 2:46

4-5-19















Lab: Project 4a


4-8-19

Lab: Project 4a

4-9-19

Lab: Project 4a

4-10-19

Lab: Project 4a

4-11-19

Lab: Project 4a

4-12-19






















Lab: Project 4a

4-15-19

Lab: Project 4a

4-16-19

Lab: Project 4a

4-17-19

Lab: Project 4a

4-18-19

No School

4-19-19




















Intro to Combination project

Lab: Combination RIM document

4-22-19

Lab: Combination RIM document

4-23-19

Lab: Combination RIM document

Due @ the end of class.

4-24-19

ab: Combination project

4-25-19

ab: Combination project

4-26-19



















ab: Combination project

4-29-19

ab: Combination project

4-30-19

ab: Combination project

5-1-19

ab: Combination project

5-2-19

ab: Combination project

5-3-19




















ab: Combination project

5-6-19

ab: Combination project

5-7-19

ab: Combination project

5-8-19

Lab: Combination project

Due @ 2:46

5-9-19

Intro to final project

Lab: RIM document due @ the end of the day Monday


5-10-19















Lab: Final project RIM document

Due @ 2:46

5-13-19

Lab: Final Project

5-14-19

Lab: Final Project

5-15-19

Lab: Final Project

5-16-19

Lab: Final Project

5-17-19



















Lab: Final Project

5-20-19

Lab: Final Project

5-21-19

Lab: Final Project

5-22-19

Lab: Final Project

5-23-19

Lab: Final Project

5-24-19

















No School

5-27-19

Lab: Final Project

CreaTech Competencies Test

5-28-19

Lab: Final Project

CreaTech Competencies Test

5-29-19

Lab: Final Project

Due @ 2:46

CreaTech Competencies Test

5-30-19

Lab Clean-up day

5-31-19
















Objective: Students will review for the final exam

6-3-19

Exams

6-4-19

CreaTech Drafting Final Exam

6-5-19

Exams

6-6-19

No School: Staff in-service

6-7-19


Website by SchoolMessenger Presence. © 2019 West Corporation. All rights reserved.