Course Introduction
Class Expectations
Class Procedures/Policy
Theft/Vandalism Policy
Sign Sheet
Parent/Student Signature Sheet
1-21-19
Finish:
-Skills Inventory
-Assign Lockers
1-22-19
Tour of Technology
-Epilog Laser Demo
-CNC Router Demo
-CNC Plasma Demo
1-23-19
Introduce 1st project (Engrave existing piece, requirements, generate ideas)
G.C Assign, Drawing & Paragraph due Tuesday.
Content
-Sketching, Drawing, value, orthographic projection, pictoral, dimensioning.
Alphabet of lines handout
1-24-19
Log into computers 1st time
-Clear expectations
-Assign computers to students
-Google classroom login
-Pinterest account setup
1-25-19
Demo: Intro to Epilog laser, Using Word & Powerpoint
-Key features
-Hidden Concepts
Lab: Project 1 (sketch work w/ written description)
-Bring in objectr
1-28-19
Demo: Intro to Epilog Laser, features at the laser
-Control panel
-Setting up a workpiece
Lab: Project 1 (Sketch work
1-29-19
Lab: Project 1 (powerpoint & at the laser)
- Be sure all drawings and written descriptions have been approved
1-30-19
1-31-19
Intro to project 2 (cutting & engraving task)
-Req. generate ideas not an elaborate task, a task purpose for project combined cutting & engraving.
Lab 1 & 2. projects 1 students take precedence. Project 1 due @ end of day.
2-1-19
G.C Drawing & write up due @ the end of the hour.
LabL 1b (Cutting)
2-4-19
Intro to first Woodworking project (intarsia)
Lab 1b (Laser cutting)
2-5-19
2-6-19
Content: Woodworking competencies
Miter saw demo
Over of processes, jointer, planer, tablesaw.
2-7-19
Miter Saw safety test
Band Saw/scroll saw
Overview of processes: sanding materials & processes
2-8-19
Band saw / Scroll saw safety test
Sanding safety test
Lab 1b (cutting)
2-11-19
Project 2. Intarsia
Requirements (Examples)
Process video
2-12-19
Project 1b due
If done work on plan 2. Have sketch size for project.
RIm document showed to class
2-13-19
Intro the RIM doc (planning)
Resources / Info / Materials
G.C RIM Document for project 2
2-14-19
Lab: Project 2 (RIM & AutoCAD work)
2-15-19
Tech Competency Test
(Design, epilog laser)
Lab: project 2 (RIM & AutoCAD work)
2-18-19
Project 2 RIM Document on G.C due Today @ end of class.
Lab: Project 2 (RIM & AutoCAD)
-Work on plywood.
Time to carve outside of class.
2-19-19
Lab: Intarsia
2-20-19
2-21-19
Distract Inservice: No School
2-22-19
2-25-19
Project Due @2:46
2-26-19
Intro concepts of CNC (brief)
-What is CNC
Demo in front of router
Machine running/examples
Start Aspire tutorial with handout
2-27-19
Finish Aspire Tutorial
Introduce graphics we have available
Introduce aspire task 3a
-Not to be cut, only previewed
-A sign with specific specs
-see project handout 4 details
2-28-19
Parent Teacher conferences: No school
3-1-19
CNC Router formative assessment
-Project 3b work time
3-4-19
CNC router bits presentation
lab: Last day for project 3a.
Due @ the end of class.
3-5-19
CNC Router test.
Lab: 3b RIM document. Due @ 2:46 on friday
3-6-19
3-7-19
Lab: 3b RIM document. Due @ 2:46
3-8-19
Lab: 3b CNC Router
3-11-19
3-12-19
3-13-19
3-14-19
3-15-19
3-18-19
3-19-19
3-20-19
3-21-19
Due @ 12:00
3-22-19
Content: Intro to metals
4-1-19
CNC Plasma / Handheld plasma demo
-Intro to project 4a CNC Plasma
4-2-19
Lab: Project 4a planning day
4-3-19
4-4-19
RIM document due @ 2:46
4-5-19
Lab: Project 4a
4-8-19
4-9-19
4-10-19
4-11-19
4-12-19
4-15-19
4-16-19
4-17-19
4-18-19
No School
4-19-19
Intro to Combination project
Lab: Combination RIM document
4-22-19
4-23-19
4-24-19
ab: Combination project
4-25-19
4-26-19
4-29-19
4-30-19
5-1-19
5-2-19
5-3-19
5-6-19
5-7-19
5-8-19
Lab: Combination project
Due @ 2:46
5-9-19
Intro to final project
Lab: RIM document due @ the end of the day Monday
5-10-19
Lab: Final project RIM document
5-13-19
Lab: Final Project
5-14-19
5-15-19
5-16-19
5-17-19
5-20-19
5-21-19
5-22-19
5-23-19
5-24-19
5-27-19
CreaTech Competencies Test
5-28-19
5-29-19
5-30-19
Lab Clean-up day
5-31-19
Objective: Students will review for the final exam
6-3-19
Exams
6-4-19
CreaTech Drafting Final Exam
6-5-19
6-6-19
No School: Staff in-service
6-7-19